top of page
Search

Understanding ADU Zoning Laws



One of the first hurdles in building an Accessory Dwelling Unit (ADU) is understanding local zoning laws. A common concern is: What zoning restrictions apply to ADUs, and how can they affect the ADU permit process?

Knowing these rules early on — and using a preapproved ADU plan or permit ready ADU plans — can prevent costly delays and redesigns.

What Are Zoning Laws?

Zoning laws control how land can be used. For ADUs, zoning laws determine:

  • Where ADUs can be built

  • Maximum allowed size

  • Required setbacks from property lines

  • Parking requirements

  • Height restrictions

Cities and counties may have slightly different regulations, but California state law mandates that most residentially zoned lots allow at least one ADU.

Key Zoning Factors to Understand

1. Lot Size and Shape

Most jurisdictions allow ADUs on lots of any size. However, tight or oddly shaped lots may make it harder to meet setback or parking rules without design adjustments in your ADU blue print.

2. Setbacks

Setback rules specify how far an ADU must be from:

  • Property lines

  • Streets

  • Other structures

Some cities require setbacks of at least 4 feet for detached ADUs, while garage conversions may maintain existing setbacks.

3. Maximum Unit Size

  • Detached ADUs: Up to 1,200 square feet typically allowed

  • Attached ADUs: Limited to 50% of the primary residence size

Smaller permit ready ADU plans often fit neatly within size limits, speeding up permit approvals.

4. Height Limits

Height limits usually range from 16 to 25 feet depending on:

  • Single-story or two-story design

  • Whether the ADU is detached or attached

Height compliance must be clearly shown in your ADU blue print and elevation drawings.

5. Parking Requirements

Parking may be required unless:

  • The property is within half a mile of public transit

  • The ADU is part of a garage conversion

  • On-street parking is sufficient

Using a preapproved ADU plan that accounts for parking rules simplifies approvals.

How to Navigate Zoning More Easily

  • Review your city’s ADU zoning handout or ordinance

  • Check property-specific issues like easements or flood zones

  • Work with a professional familiar with local zoning codes

  • Use permit ready ADU plans that are already designed to comply with typical zoning requirements

Real-World Example

A homeowner in Oakland selected a preapproved ADU plan designed to meet standard city setbacks and parking exemptions.Result:

  • No variances or special hearings required

  • ADU permit approved within 6 weeks

Common Mistakes to Avoid

  • Assuming an ADU can be any size

  • Forgetting to check setback rules for second-story ADUs

  • Overlooking garage conversion parking exemptions

  • Submitting plans without verifying zoning compliance

Final Thoughts

Understanding and respecting ADU zoning laws is critical for a smooth and timely permit process. At ADUnest, we help homeowners by preparing detailed ADU blueprints, recommending compliant preapproved ADU plans, and offering permit ready ADU plans that align with zoning and code standards from the start.If you have questions about zoning rules for your ADU project, feel free to leave a comment below — the ADUnest team will get back to you quickly to guide you!

 
 
 

Comments


© 2025 Adunest. All rights reserved.

bottom of page