How to Get an ADU Permit for a Garage Conversion
- mseirafi
- Apr 25
- 2 min read

Garage conversions are one of the fastest and most affordable ways to create an Accessory Dwelling Unit (ADU). But a key question comes up early: How can the ADU permit process for a garage conversion be handled smoothly?
Knowing the specific steps and preparing the right documents — like a detailed ADU blue print and a permit ready ADU plan — will help fast-track your project.
Step 1: Verify Garage Eligibility
Before starting a garage conversion:
Confirm that zoning allows ADUs
Check setback requirements
Make sure the garage has good structural integrity
Some cities offer a streamlined process for converting garages into ADUs, especially if you use a preapproved ADU plan.
Step 2: Prepare the ADU Permit Documents
A complete application package typically includes:
Site plan showing the garage and lot
Detailed ADU blue print with room layouts
Structural upgrade plans (for foundations, framing, roofing)
Energy compliance documents (Title 24 reports)
Submitting a clean, complete ADU permit package minimizes correction cycles.
Step 3: Address Utility and Energy Needs
Garage conversions often require:
New plumbing lines (for kitchens and bathrooms)
Electrical panel upgrades
Insulation and HVAC updates to meet energy codes
These upgrades must be shown clearly in your permit ready ADU plans.
Step 4: Submit and Track Your Permit Application
Submit your full set of drawings and documents
Pay the required plan check and permit fees
Track your submittal and respond quickly if corrections are needed
Using a preapproved ADU plan can sometimes reduce plan review times by 30% to 50%.
Step 5: Schedule Inspections
After permit approval, inspections are required at key stages:
Foundation reinforcement (if needed)
Framing and structural modifications
Plumbing, electrical, insulation
Final inspection for occupancy approval
Properly detailed ADU blue prints help ensure passing inspections the first time.
Real-World Example
A homeowner in San Diego used a city-provided preapproved ADU plan to convert a 400-square-foot detached garage. By preparing detailed permit ready ADU plans and responding to corrections within 48 hours, the full ADU permit process took just eight weeks from submission to approval.
Final Thoughts
Converting a garage into a beautiful, livable ADU is achievable when the permit process is handled carefully and professionally. At ADUnest, we specialize in preparing detailed ADU blueprints, providing access to preapproved ADU plans, and guiding homeowners through the entire permit process with permit ready ADU plans designed to avoid delays.If you have any questions about your garage conversion project or how to move forward faster, feel free to leave a comment below — the ADUnest team will assist you quickly!