top of page
Search

ADU Drawing: What It Includes and Why It Matters



When planning an Accessory Dwelling Unit (ADU), one essential early step is preparing the right ADU drawing.Homeowners often ask: What should be included in an ADU drawing, and why is it so important for permit approval?

Using a complete ADU blue print, a preapproved ADU plan, or permit ready ADU plans ensures faster approvals and smoother construction.

What Is an ADU Drawing?

An ADU drawing is a full set of professional construction documents showing:

  • Site layout

  • Floor plans

  • Elevations

  • Structural framing

  • Plumbing, electrical, and mechanical details

  • Energy efficiency compliance

Without a complete ADU drawing, securing an ADU permit becomes much harder and slower.

Key Elements Every ADU Drawing Must Include

1. Site Plan

The site plan must show:

  • Property boundaries

  • Location of existing structures

  • Placement of the proposed ADU

  • Parking layout (if required)

  • Driveways and pathways

Clear, scaled site plans help zoning officials confirm that the ADU meets setback and coverage limits.

2. Floor Plan

Floor plans must detail:

  • Room layouts and dimensions

  • Door and window placements

  • Kitchen and bathroom arrangements

Using a permit ready ADU plan ensures all code-compliant design elements are included.

3. Building Elevations

Building elevations must display:

  • Exterior wall heights

  • Roof slopes and materials

  • Window and door locations

  • Street-facing designs (if required)

Good elevations ensure compliance with height restrictions and neighborhood character guidelines.

4. Foundation and Structural Plans

Structural drawings must show:

  • Foundation layout and reinforcement

  • Wall framing details

  • Roof framing

  • Seismic safety connections

A solid ADU blue print greatly reduces correction rounds during permit review.

5. Plumbing, Electrical, and Mechanical (PME) Plans

These technical plans must include:

  • Plumbing line layouts

  • Electrical circuits, panels, and outlet locations

  • Heating, cooling, and ventilation systems

Clear PME drawings help prevent field inspection problems later.

6. Energy Compliance Reports

Title 24 energy documents must match:

  • Insulation R-values

  • Window performance data

  • HVAC system efficiencies

These documents are usually built into preapproved ADU plans or added separately to a permit ready ADU plan package.

Why Accurate ADU Drawings Matter

  • Faster Permits: Clear, professional drawings make city reviewers' jobs easier.

  • Cost Control: Reduces chances of unexpected construction changes.

  • Inspection Success: Helps ensure the project passes all city inspections easily.

  • Legal Protection: Shows the project was designed to meet building code standards.

Real-World Example

A homeowner in Sunnyvale submitted a clean ADU blue print and adapted a preapproved ADU plan for a 450-square-foot detached ADU.Their ADU permit was approved in under seven weeks with zero corrections needed — saving both time and money.

Common Mistakes to Avoid

  • Submitting incomplete or hand-drawn sketches

  • Forgetting dimensions or material specifications

  • Not showing required fire separation details

  • Omitting Title 24 energy compliance forms

Final Thoughts

High-quality ADU drawings are the foundation of a smooth, stress-free project from permitting through final inspection.At ADUnest, we help homeowners create detailed ADU blueprints, adapt preapproved ADU plans, and prepare permit ready ADU plans designed for fast, successful approvals.If you have any questions about ADU drawings or how to start your project, feel free to leave a comment below — the ADUnest team is always ready to assist you!

 
 
 

Comments


© 2025 Adunest. All rights reserved.

bottom of page